I am fairly new to SAP PM so please bare with me. We have a corporate configuration of SAP PM with various assets spread out in different areas. Each of these areas has their own maintenance plant assigned and in my case I have 3 separate plants. I am wondering if it is possible to modify configurations of various items based on a plant and not globally where it would affect all plants as they may not want the same configuration as I do. For instance, when creating a notification and selecting a priority, the system asks if I want to specify new dates. Depending on which Priority is selected (Emergency, Critical, Routine Medium, Routine Low) the Required Start and Required End dates are calculated and populated based on a system setting. What I am asking is if a configuration setting such as the above can be plant specific?
I appreciate any feedback or advice anyone could provide.